Videos

Video center for solutions, projects and engineering insights

Company introductions, technical insights, project footage and authorized client interviews help owners review BICP’s engineering capabilities and project practices more directly.

Project FootageProject site footage and delivery process videos.
Project FootageAvailable
Cold ChainHomepage Featured

Zhongtong Cold Chain Warehouse – BICP Taiku PT Flat Slab

Zhejiang Zhongtong cold chain warehouse adopts BICP Taiku post-tensioned flat slab system. Column grid 11.2m×12.6m, slab thickness 600mm, story height 13.27m. Storage capacity inc.

Watch video →
Project FootageAvailable
Cold ChainHomepage Featured

Chengdu Yinli Cold Chain: Large-Span PT Solution Boosts Storage

Chengdu Yinli Cold Chain Logistics Center, the largest in Southwest China, uses BICP's Taiku large-span post-tensioned cold storage system, boosting rack capacity by 40% over trad.

Watch video →
Project FootageAvailable
Cold ChainHomepage Featured

Chenzhou Agricultural Products Logistics Park – Taiku Cold Chain

BICP Taiku cold chain warehouse solution empowers Chenzhou Agricultural Products Logistics Park, addressing low capacity and high costs with post-tensioned structures and integrat.

Watch video →
Project FootageAvailable
Industrial FloorHomepage Featured

Qufu ETDZ Sci-Tech Innovation Park – Post-Tensioned Floor Case St

Qufu Economic Development Zone Science and Technology Innovation Industrial Park adopted BICP's post-tensioned floor technology, achieving a 100-meter joint-free integrated floor.

Watch video →