Video
Chengdu Yinli Cold Chain: Large-Span PT Solution Boosts Storage
BICP client revisit: Chengdu Yinli Cold Chain Warehouse Taiku product case study. Understand post-tensioned structures, integrated flooring, and AI-powered dig.
The Chengdu Yinli Cold Chain Logistics Center is the largest cold chain logistics base in Southwest China, providing integrated warehousing, distribution, and cold chain logistics services for e-commerce enterprises. After Phase I (2014) and Phase II (2019) commenced operations, Phase III (B3, B6 cold storage and distribution center) is now under construction. BICP continues to deliver large-span post-tensioned cold storage solutions, post-tensioned design, and professional contracting services, supporting the development of this national backbone cold chain logistics base. Since 2016, BICP and Huashang International Engineering have jointly pioneered the first 'Taiku' large-span post-tensioned flat slab cold storage system in China (Phase II B4, B5), breaking traditional column grid constraints and increasing storage efficiency by approximately 40% in rack capacity compared to the smal.