Videos

Video center for solutions, projects and engineering insights

Company introductions, technical insights, project footage and authorized client interviews help owners review BICP’s engineering capabilities and project practices more directly.

Client InterviewsClient feedback, project operating experience and post-delivery review videos.
Client InterviewsAvailable
Cold ChainHomepage Featured

Huangshanghuang Cold Chain Warehouse – BICP Case Study

BICP applied post-tensioned technology for Huangshanghuang cold chain warehouse, achieving large-span column grids and seamless structure, reducing civil costs by 15% and increasi.

Watch video →
Client InterviewsAvailable
Cold ChainHomepage Featured

Xianfeng Fruit East China Smart Cold Chain Project

Xianfeng Fruit East China Smart Cold Chain Project uses BICP's Taiku solution, increasing storage capacity by 16.7% with wider column grids and integrated flooring.

Watch video →
Client InterviewsAvailable
Industrial FloorHomepage Featured

Chengdu Airbus Full Lifecycle Project – Post-Tensioned Floor

Chengdu Airbus Aircraft Full Lifecycle Service Project uses post-tensioned integrated flooring. General contractor: China Construction Third Engineering Bureau. Designer: China Av.

Watch video →