Video

Chenzhou Agricultural Products Logistics Park – Taiku Cold Chain

BICP Taiku cold chain warehouse case study: Chenzhou Agricultural Products Logistics Park. Learn how post-tensioned structures and integrated flooring solve lo.

Back to Home

Under the national strategy of rural revitalization and agricultural modernization, establishing an efficient agricultural product circulation system is critical. Beijing Yintai JianGou Technology Co., Ltd. (BICP) deployed its Taiku cold chain warehouse low-carbon structural innovation solution for the China Supply and Marketing Cooperative · Chenzhou Agricultural Products Logistics Park. This project, with a total building area of 350,000 m² and investment of CNY 1.25 billion, aims to create a national-scale agricultural product distribution hub. Traditional cold storage faces challenges such as low storage capacity, high construction costs, and high maintenance expenses. BICP's Taiku solution utilizes post-tensioned structures and integrated flooring to maximize usable space, reduce material usage, and lower lifecycle costs. The AI-powered engineering project digital management platfo.