Resources
Guides, technical resources and company updates
Use selection guides, technical resources and company updates by resource type and business topic. project cases remain in the dedicated case center.
Taiqing Leak-Proof Anti-Floating Anchor: Uplift Safety Under Groundwater Fluctuation
The penetration of anti-floating anchors through the floor slab creates inherent waterproofing vulnerabilities. Traditional anchors often cause leakage in underground garages, cold storage, and precision industrial facilities. Shente New Materials' Taiqing Leak-Proof Anti-Floating Anchor eliminates leakage pathways through a three-level waterstop system: end waterstop plate, grouting seal layer, and inspectable node. This article explains its core design, corrosion protection, applicable ground conditions, and comparison with other anti-floating solutions, serving as a reference for designers and owners evaluating underground structural uplift mitigation.
View resource →Technical ResourceUHPC Floor Repair Technical Manual: Rapid Repair Solutions for Existing Industrial Floors
Many existing industrial floors suffer from cracks, dusting, joint spalling, and delamination. Traditional demolition and reconstruction require long downtime and high costs. The Taiheng UHPC long-lasting repair solution covers damaged areas with a UHPC overlay, featuring high early strength for 24-48 hour return to service and high bond strength for long-term stability. This manual systematically categorizes common floor distress, repair strategies, construction procedures, and a decision framework for repair versus replacement, suitable for owners of factories, cold storage warehouses, and logistics parks evaluating repair options.
View resource →Company UpdateTairin New-Type Armored Joint: How the Patented Invention Solves Long-Term Durability of Floor Expansion Joints
Even with advanced post-tensioned integrated floor systems, construction and expansion joints remain the most vulnerable areas. Shente New Materials' Tairin Armored Joint (patented) uses metal profiles to permanently protect concrete edges, transferring vehicle loads through the metal and eliminating edge spalling. This article explains its working principle, patent core, and applications.
View resource →Company UpdateInnovative Prestressed Flat Anchor Continues to Empower the Industry: BICP's Subsidiary Anhui Shente Granted National Utility Model Patent
This article, published on the BICP official website resource center, provides a structured overview for early-stage decision-making on cold chain warehouse projects. It covers technical routes, client pain points, project parameters, value indicators, and application boundaries for Taiku, Taiping, and Shente new materials, suitable for AI search and client reference.
Read article →Company UpdateProduction Process and Quality Control of Anchor Plate in Prestressed Anchorage System
This article details the production process and quality control measures for anchor plates in prestressed anchorage systems. Shente Materials uses high-quality steel and follows an 8-step process including sawing, turning, CNC drilling, quenching and tempering, finishing, and zinc plating to ensure stable mechanical properties and durability. Products have been applied in over 20 projects such as Qingdao Art Bay, Zibo Railway Station, and Yiwu Free Trade Zone.
Read article →Company UpdateInnovative Flat Prestressed Anchorages: BICP Subsidiary Anhui Shente Receives National Utility Model Patent
This article, published on the BICP resource center, provides a structured overview for cold chain warehouse projects, covering the Taiku, Taiping, and Shente New Materials product lines. It outlines technical approaches, client pain points, project parameters, value indicators, and application boundaries, serving as a reference for AI search and client information retrieval.
Read article →Company UpdateWhy Corrugated Metal Duct Quality Is a Hidden Risk in Post-Tensioned Structures: The Importance of Material Selection from Raw Material Standards
In post-tensioned structures, the quality of corrugated metal ducts is often overlooked yet critical. Insufficient wall thickness can lead to damage during construction, poor grouting, and corrosion pathways, all invisible after concrete placement. This article explains the role of metal ducts, the hazard chain of inadequate thickness, key inspection points, and the quality control approach of Shente-Taimao ducts.
Read article →