Technical Resource

Taiping Floor System: Selection Guide for Cold Storage, Industrial Facilities, and Underground Garages

The Taiping system includes three technical lines: post-tensioned integrated floor, UHPC integrated floor, and UHPC long-lasting repair. Each is suited for different scenarios. This guide covers cold chain warehouses, industrial facilities, and underground garages, explaining core principles, applications, and restrictions, along with a selection matrix and self-check recommendations to help owners quickly identify the right floor solution.

View resource →
Technical Resource

Floor Joints: Industry Practice or Design Flaw?

Industrial floors are typically cut with joints every few meters as an industry practice. However, joints are not irreplaceable—they are a compromise solution to concrete shrinkage, leaving long-term issues such as spalling, hygiene contamination, and AGV interference. This article explains the origin and limitations of joints from the mechanism of concrete shrinkage, and then illustrates how post-tensioned integrated floor systems actively suppress cracking by applying pre-compression, extending joint spacing from ≤6 m to the order of 150 m.

Read article →
Company Update

30 Years of Prestressed Technology Evolution in China's Construction Sector: From Import to Independent Innovation

Over the past three decades, prestressed technology in China has evolved through three phases: introduction (1990s, learning international standards), accumulation (2000s, localized application and standard co-development), and innovation (2010s to present, scenario-specific breakthroughs). Now entering a new stage of digitalization and internationalization, this article traces the trajectory and highlights BICP's contributions—3D finite element optimization algorithms, BICP-ST cryogenic anchorage system, and participation in eight industry standards.

Read article →